The Basics

The Active Transportation Plan is scheduled for completion in fall 2027. This survey runs through July 30 and there will be additional opportunities for you to share your thoughts about walking, rolling, and bicycling needs and priorities in Washington County. 

What will this project accomplish? 

  • ​​​​Reconsidering Street Design: Investigating updates to our roadway design standards that demonstrate Washington County’s commitment to complete streets and improve safety, comfort, and accessibility for everyone who uses our transportation system. 
     
  • Identifying Future Projects: Gathering ideas and evaluating which transportation improvements could best fill network gaps and strengthen connections to transit, schools, parks, and other key destinations.
     
  • Studying Ways to Improve Walkability: Examining opportunities to make walking easier—such as wider sidewalks, safer crossings, and enhancements along major corridors and bus routes. 
     
  • Assessing Bicycle Network Upgrades: Looking into bicycle facility enhancements such as separated bike lanes, safer intersections, and other improvements that could make biking more comfortable for more people. 
     
  • Evaluating Safe, Low‑Stress Routes: Considering options for neighborhood bikeways that could support walking and biking for people of all ages and abilities. 
     
  • Exploring Trail Connections: Identifying missing trail links and learning where new connections could strengthen our regional trail network. 
     
  • Reviewing Maintenance Needs: Studying how to maintain bike lanes, sidewalks, and trails so they stay clean, safe, and accessible throughout the year. 

 

 
  • Existing conditions assessment

    Summer - Fall 2026

    Perform existing conditions analysis and conduct policy and planning background review.

  • First ATP Online Open House and Survey (You Are Here!)

    June 26 - July 30 2026

    Solicit public feedback on existing conditions with outreach and engagement at public events and through the online open house.

  • Prepare the Plan

    Fall 2026 - Spring 2027

    Develop draft project and policy recommendations, including new multimodal design guidance and street cross-sections.

  • Second ATP Online Open House and Survey

    Spring - Summer 2027

    Solicit public feedback on draft plan with outreach and engagement at public events and through the online open house.

  • Finalize the Plan

    Fall 2027

    Revise plan based on feedback and incorporate into County's Transportation System Plan update.